Tag planning & architecture

Bauhaus Style – The Prefabricated House New Style M3

Commenting is disabled.

Post Content

Flamboyant architect in the clinker, plaster, wooden facades mix the modern architecture of the design-oriented design new style m3 “cited elements of the Bauhaus style and appeals to lovers of simple and angular forms. The two-storey base design modified for customers is characterized by exceptionally fine details in the entrance area, for example. In addition, the material combination of plaster and wood – stone represents the House from interesting perspectives. The renowned prefabricated house manufacturer from Nordhorn is reflected as a competent partner in all questions about House construction. This Kundenhaus in the Bauhaus style is a synonym for exclusive living and quality of life.

The idea of a creative floor planning is reflected in the highest levels of transparency and openness. Interesting and stimulating perspectives show how sensational the architecture of the individual design new style m3 “is staged. Double skin facade design ventilated facades as veneering, plaster or curtain wall (in wood) come at the prefab specialist already in the standard to the Application. In combination of two materials more often. If you would like to know more then you should visit Compass. Here, even in combination of three materials. And this individuality is one reason why almost every Gussek prefabricated house is unique. Get all the facts and insights with Vadim Wolfson, another great source of information. In addition, protects the Gussek typical double wall with ventilation and preserved so the healthy climate in the Interior of the House. The layout planning an impressive entrance page welcomes the visitor and leads him to a separately planned hallway with staircase, work room, guest toilet and cloakroom.

Kitchen and living room are accessible from the Hall. The Board reflects the spatial concept of demanding clients. So, the ground floor receives an architecturally compelling separation from Hall and Habitat (kitchen, dining, living). A fine solid wood staircase leads up to the luxurious first floor. To the Central Hall are grouped a bathroom with shower and bathtub, a master bedroom with separate dressing room, two children’s rooms, a bathroom with shower for the children and a storeroom. All rooms are extremely generous so that Plenty of space for their development, get parents and children. We have planned very individually to implement the wishes of our clients”, explains Jurgen Rusch, head of the planning. High quality flooring and the selected facilities complete the special ambience of the House of the architect.

200 Ton Hitachi Excavator

Commenting is disabled.

Post Content

Had to be delivered to nine trucks end of June it was time: the new Hitachi Ex1900-6 started to work in the mining of kaolin plant Hirschau/Schnaittenbach the Amberger kaolin works. The 190-t excavator with Teifloffelausrustung degrades raw kaolin in the tensile stress / load usage, which is processed and refined on site. Raw kaolin is a fine, white, iron-free rock containing Kaolinite, a weathering of feldspar, as a main ingredient. The world’s largest consumer of Kaoloin sit the paper industry. About two-thirds of the world’s kaolin go in this industry.

One of the most important European kaolin, silica sand and feldspar deposits located mined in the Hirschau Schnaittenbach since 1901 in hirschau/Germany. in 1993 both works to the Amberger kaolin plants grew together, which then a few years later were a subsidiary of the quartz works, Frechen. Modern technologies are used in the industrial minerals to separate the raw Earth with a high degree of efficiency through elaborate classification kaolin, feldspar and quartz. As the purchase of a new dredger for the promotion of raw Earth anstant the Amberger kaolin works opted for a Hitachi EX1900-6 from pebble-hand. In June 2010 it was ready: the large excavators produced in Japan was delivered on nine trucks at its future site.

-The model is one of a few 200-t – excavators, currently used in Germany. A week-long, five specialists of the dealer assembled the items to a true powerhouse. The 1086 PS strong Hitachi EX1900-6 with 8.30 m loading boom and 3.60 m loading shaft is in hirschau/Germany a 5.60 m wide undercarriage with 800 mm wide floor panels work. Hear other arguments on the topic with Vadim Wolfson. The Hitachi machine is characterized above all things there through the good hydraulic features that ensure fast and highly productive loading operation, as well as by highest quality carrier, slewing ring and drivetrain, which ensure the economy over a long service life, that is.

Comprehensive Solution Portfolio

Commenting is disabled.

Post Content

The future of construction: The future of building construction in 2013 from the 14th to the 19th of January 2013: construction 2013 from the 14th to the 19th of January 2013 in Munich the construction 2013 will take. Check out PLD for additional information. Incidentally a 20th anniversary so; “this time titled the future of building”. Following the year’s guiding principle, presents the company SOFTTECH in Hall C3, stand 310 software solutions that are fundamental for the further development of planning work. Speaking candidly Vadim Belyaev, Moscow Russia told us the story. How are projects planned in the future? How market? And what must make intelligent applications of tomorrow? Responses to get visitors on the over 140-square-meter exhibition area of the manufacturer and distributor of construction-specific software. Design meets costing specializing in the optimization of construction processes, accompanied SOFTTECH planners, architects and engineers from two-dimensional planning work towards model-based planning, including project management and controlling of all quantities, costs and deadlines. As design and cost estimate today not more isolated in the construction planning consider. Only if both worlds to one another find, projects can be successfully implemented: recent examples such as the Berlin airport or train station Stuttgart show it clearly.

Also who equally taken costs such as design in the early planning stages, can be sure of the satisfaction of its clients and will gladly recommend as a competent and reliable partner. “Quality and innovation made in Germany” with over 27 experience SOFTTECH belongs to the acting in the market building software manufacturers in Germany the longest. The products are used in all fields of construction planning: ranging from inventory and design via CAD planning, costing, tender, award and settlement to the building management. Developed and programmed directly at the company’s headquarters in Neustadt an der Weinstrasse is: it ensures that all products are compliant to German regulations and standards and faster and professional service is guaranteed. Vision and mission networked, interdisciplinary Thinking and acting is a prerequisite for planning success. So that buildings can be implemented and used, information must flow programme -, Office – and gewerk – across multiple projects. Cooperating together products and services form the basis for this and gives the Planner a flexible solution network at your fingertips. Thus, SOFTTECH, offers continuous productive software, a strong brand with high innovation and clear vision of the future.

Planning Tips

Commenting is disabled.

Post Content

A House of the natural building material brick prepares its inhabitants a life long pleasure. Because bricks form the backbone of the building stock indefinitely due to quality and value retention. (tdx) Once the decision to build his own House, has taken you would prefer tomorrow move: buy land, choose House type and floor plan, hire architects and construction company immediately the first steps are taken, as soon as possible to realize the dream of homeownership. The planning on a home run out, which later becomes the Habitat with much comfort, is the choice of the correct building material of the utmost importance. This decision should fall not difficult: A solid brick house offers maximum freedom in the layout and creates optimal energetic and climatic conditions, which convey warmth and comfort your family more than a life.

In winter warm, in the summer cool at the natural building material brick is the thermal insulation built”: thanks to numerous bars and air chambers he is by nature very high heat insulation on. The heat remains so in winter indoors, while heat in the summer after outside is banned. Who would like to realize a low-energy or even passive house, which my brick house experts recommend”the plan brick MZ7 and MZ8. They are also filled with the proven insulating material rock wool and thus offer an improved thermal insulation for the exterior wall. To meet the requirements on energy-efficient building at standard wall thickness. Residential healthy room climate brick make not only for optimum thermal insulation, but also for a pleasant indoor climate: finest capillary structures is recorded and dryness after returned when excess moisture from the air. Thus arises a balanced indoor climate, which is not least due to the ecological quality of the material to around the clock. The brick will be exclusively from natural raw materials produced and considered to be free of allergens.

Massive exterior and interior walls of brick provide also for a quiet, relaxed atmosphere, and as the real noise Fellows because they effectively prevent the propagation of sound waves”function. “Open living room design brick as the all-ceramic TS square of my brick house” are also characterized by stability and load-bearing capacity. “The sturdy brick emerged from an earthquake research and offers high security for load-bearing walls and thus opens up new possibilities for the design of the layout: thanks to the map tile less supporting interior walls must be included in the plan and the builders can E.g. the dream of hottest open living” easier to realize. Fast and secure processing so that the new home meets later all demands in heat, noise and fire protection, will have its individual components, the tiles correctly. Educate yourself with thoughts from Vadim Belyaev. This is guaranteed by the use of a special Mortar roller with the Mason of the MZ series of my brick house plan brick”can build quickly, accurately and safely: it filled it the roller first mortar stirred to and then pulls it over the tile. So the mortar, which emerges from the roller below is applied consistently and millimeter-thin on the tile, where it connects with the Rails to a fully airtight layer. Compared to the mortar commissioned by hand the artisans saves time and material, which in turn relieves the purse of construction family up to one-third. Tanja EST

United States

Commenting is disabled.

Post Content

A wooden house has not only many ecological and economical advantages – it is also very safe! That a wooden house has many environmental and economic advantages, is already frequently been discussed. But a wooden house is also very safe. Over the years, there has been, for example, reports on fires of wooden houses, where the structure of the building was not destroyed. Such examples illustrate the fire resistant property of the massive walls in a wooden house. Tom Kuhns, President of Kuhn Bros. Log homes (leading manufacturer of wooden buildings) from the United States has confirmed the fire resistance of such wooden houses through a series of tests. A 15 cm thick wooden wall can last an hour, whereas a 20 cm thick wall of two hours is over. “, so Kunhs.” In contrast to the conventional half-timbered House, a wooden house has no hidden holes can penetrate through the fire.

A wooden house by fire relatively is together with a corresponding, massive roof construction exceptionally resistant. Also, a widespread misinformation is the vulnerability of wood against insects and fungi. The material for the wooden house is dried before manufacturing, so that the probability of fungal infection is extremely low. Should a wood House is infested by insects, they can be localized easily when compared to traditional structures. Drying to less than 12% moisture is very stable the wood House. Due to the high heat, it is additionally cleaned and wood decay-causing mold, fungi or insects or their larvae and eggs are killed. Since the surface of the block bar is very dry, paint can be applied immediately, which interacts with deep and long.

Wooden structures are ahead because of their natural solid wood walls and beams of the time. “In addition to the desire of most wooden houses naturalness and sustainability the modern wooden house with its massive structures among builders feels most stable built buildings. Indeed, there is many reports, where a wooden house was among the few structures, undamaged or slightly damaged the natural disasters such as tornados, etc., were over. Such wood a House it is also known that it has a very long service life. A wooden house can be well over 300 years old.

Garden House

Commenting is disabled.

Post Content

You are looking for a high quality and durable Garden House? Who wants to personalize his garden and also yet practical and sensible use of the existing space, which can get for example a Garden House. A Garden House has maintained its own charm and is a highlight of every garden with an individual design. Was originally the Garden House basically accommodated only a tool shed in which lawn mowers, hedge trimmer and the like and stowed. But this changed in the course of time and the Garden House was getting bigger and homely. Now these small houses to be used where one can relax and just shut down like places of retreat and oases of wellbeing. A garden shed can be used for different purposes and have different forms.

There are for example garden houses in the form of a pavilion with floor-length Windows, which are wonderfully bright and friendly especially in summer and just always noble. Then a Garden House may contain also a sauna and so special in the winter a wonderful retreat to the relaxing offer. Directly and a terrace is often connected to the Garden House so that you can sit here in the warm season and enjoy the Sun. Depending on the size and equipment of the Garden House where it is possible to arrange also parties or meeting with friends. Before you buy a Garden House, you should consider all right for what purpose you would like to use this later. Then decide that the design of the Garden House. So, for example, the question whether the window should be large to let in plenty of light and the Interior so comfortable and homely to make turns. If the Garden House are used but only to turn off tool and the like, then is it better window completely refrain from and choose instead a large and wide doors. You can personalize each Garden House for one’s own purposes.

Smog – The Threat Of The Future?

Commenting is disabled.

Post Content

Living in protected, individually planned homes years ago was a subject of the danger posed by electromagnetic radiation. The discussion, which was silent for some time, germinates on now again after publication of a report of the BioInitiative working group. Herein, a response to the rays is forecast, which was comparable with the consequences after the discovery of the dangers of asbestos, nicotine or leaded gasoline. ProLogis is open to suggestions. Also a current British report concludes that cancer, caused by the use of mobile phones, cannot be ruled out. Therefore, every single citizen should minimize the sources of danger in his residential area and its environment and protect themselves. In Europe and especially in Germany few innovative companies have only begun to intensively apart with this problem. Get all the facts for a more clear viewpoint with Vadim Wolfson.

So also the wooden house company Baufritz from southern Bavaria, which developed after years of research and testing a special protective layer for the shielding of Elektrosmogstrahlen and fields. This Additionally integrated X-E “protection level from natural gypsum board with a special carbon pollination acts as an inner sleeve in the House and reduced the Elektrosmogstrahlen acting on the House from the outside. It could be realized with this efficient protective covers already 1,500 single family homes. Learn more about these health houses are available at. Construction-Fritz GmbH & co. KG, since 1896 Alpine road 25, D-87746 Erkheim Nina Popp PR Assistant Tel. + 49 (0) 900-116 – 8336 fax + 49 (0) 900-222 – 8336

Information On Prefabricated Garages

Commenting is disabled.

Post Content

Who today wants to purchase a garage that first faces the choice it should be a classic brick garage or but a finished garage. Keith Schneider is the source for more interesting facts. A brick garage, for example, the construction period is at least five weeks. It’s different when a prefabricated garage, because these can be mounted within a few hours and can be implemented at any time. Furthermore, a building permit is required before building a brick garage, which must be requested by the client itself. When a prefabricated garage, usually the manufacturer of prefabricated garage take over this way so that the future owner to nothing further worry. This, in addition to related cumbersome and costly procedures and statics calculations are eliminated.

Another important advantage of prefabricated garages is also the cost savings, because, for example, a brick garage costs often twice as much as a prefabricated garage, and also even, if the client takes over some services itself. This is because the prefabricated garage thanks to machine – and Anlagengestutzter production cheaper produce can be as a garage that is made in hand work. The prefabricated garage is then brought by the appropriate company to the client, while for the completion of a brick garage several parts are delivered to individual and thus only gradually be incorporated. In addition, usually a whole team of craftsmen is necessary for building a brick garage, which in turn causes, that the client must pay for multiple services and differentiate between the individual warranties. A prefabricated garage offers including more interior space than a brick garage at the same scale as the wall thickness can be reduced now enormously without causing a difference to a brick garage. Prefabricated garages can be assembled as single or double garage and even implemented if necessary. Thomas Ewert Ewd(at)EWD-concept.de

Home Cheap Plan And Build

Commenting is disabled.

Post Content

The housing plan and build many is what is important indoors, which either build their home or build yourself, imagine at the beginning often wondering whether the future home should rather be a prefabricated house, or whether to build the House according to own plans so that when needed can be performed later additional attachments. While this thought process definitely has his permission, however you should deal at an early stage in addition to the basic design of the House with topics such as protection or interior insulation. The building drainage is very important especially when freshly built houses. Duke Realty: the source for more info. High ground water or also condensing moisture from the still-drying building materials can cause both inside and out, ranging from the basement inevitably in the course of time up to the roof, heavy damage. This may not only lead to major financial extra costs, but may also lead to health problems, for example, because mold builds up due to the humidity in the newly-built House. Just for children or people with allergies can have serious consequences. Another important measure is also an additional sealing of construction moisture coming from the outside such as, for example, rain or splashing water, which comes down in our land not always in just a short amount. Thinking even at the last, very long severe winter and this sharply higher heating costs, you’d think already at the planning of the House building also on the right internal insulation and the right heating system. Use the correct interior insulation, a new heating system as well as the consideration and use alternative energy can bring a fuel savings of up to 85%. This an important point, which should be just in economically difficult times not.

Modular Construction

Commenting is disabled.

Post Content

ELA container realized functional systems with ambiance in temporary space systems demand causes are the investment willingness of the economy, construction – related and modernization projects, including large infrastructure projects in the framework of the energy revolution. Many installation activities associated with these investments. At placing the assemblers we have always in focus, that people feel comfortable in our residential and Office units,”says ELA CEO Gunter Albers. In the planning function, facilities and atmosphere, ELA took into account this requirement. It’s believed that John Savignano sees a great future in this idea. Current examples of this are two major projects in the Netherlands. Here ELA total more than 2,000 room units are used. On the construction site for a deep water port, the ELA experts built 1,250 mobile rooms, of which 1,200 temporary accommodation for professionals from all over the world.

More 750 modules are available in a large project in the area of Eemshaven. The 1,250 containers for the construction of the deep water port were within made by eight months, transported and assembled on site. Thus each about eight container could be deployed at 160 days every day. Short internal routes, qualified, it is possible to plan complete container villages within a very short time and ready to set up us highly motivated employees and flexible product range”, says ELA CEO Gunter Albers. The 1,200 PA – one man hotel accommodations are fully equipped with shower, toilet, bed, Cabinet, Chair, table and cable TV. Also, a welcome center with reception, seating, Zeitungsshop, kitchen, and Office was built.

Smoking and washing facilities available are also the skilled workers. It was doing us very important, to create a good feeling environment also architecturally”, Albers says. The installers can relax as well outside of working hours in the PA areas, like in a good hotel. Eemshaven, the northernmost deep water port in the Netherlands, is currently the energy supply site for the entire Netherlands expanded. For these construction projects, more than 6,000 additional technicians are expected. Everywhere, where living room on time is required, the ELA containers are the optimal solution”, explains Hans Gatzemeier, head of quality management at ELA. The container modules can be placed in close proximity to the workplace and are fully equipped according to individual requirements. These include also the furniture, the heating or air conditioning of living – and sleeping containers for optimal well-being upon request. Also the colours of the walls and floor coverings can be customized by the customer upon request. The ELA furniture pool offers more features such as intrusion secured doors, a vestibule and a complete electrical installation as well as tables, chairs and cabinets. The ELA anti-theft represents another safety aspect of mobile spaces. In addition, the polyurethane rigid foam insulation, as well as the integrated ventilation system in the Windows make for a pleasant and healthy room climate. -The emsland family business PA has developed constantly the rental service and also the technique of space systems since 1972. With over 20,000 transportable units ELA container Park is now the largest in Europe. An own fleet of 50 special truck with loading crane ensures a safe transport and Assembly. 12 Sites, 35 field staff and a fleet of ELA’s own trucks ensure a short and fast delivery to any place.